Now showing items 1-11 of 11

  • Cascading Bow-Tie Analysis 

    Popov, Georgi, PhD, QEP; Lyon, Bruce, CSP, PE, ARM, CHMM (2017-01-17)
    Bow Tie Analysis, Striped Bow Tie Risk Assessment and Cascading Bow Ties
  • FL AIHA Section FALL CONFERENCE 2016 

    Popov, Georgi, PhD, QEP (2016-09-07)
    This PDC gives participants the foundation to develop the value proposition around the financial and non-financial benefits for proposed or existing IH and EHS programs and projects. Participants will learn to use the ...
  • Near Miss Reporting 

    Popov, Georgi, PhD, QEP (2016-06-27)
    According to the National Safety Council (NSC), a Near Miss is an unplanned event that did not result in injury, illness, or damage – but had the potential to do so. NSC further describes a Near Miss as an unplanned event ...
  • New Risk Assessment Tools for Construction PtD Interventions 

    Popov, Georgi, PhD, QEP (2016-10-23)
    New Risk Assessment Tools for Construction PtD Interventions
  • Prevention through Design (PtD) Business Case: Manufacturing 

    Popov, Georgi, PhD, QEP (2016-05-24)
    One of the many challenges SH&E professionals are facing is developing skills to convince management to maximize the effectiveness of the safety program and consequently increase quality and productivity. In this session, ...
  • Prevention through Design (PtD) Education 

    Popov, Georgi I. (2011-12-03)
    Prevention through Design (PtD) addresses occupational safety and health needs in the design and redesign processes to prevent or minimize the work-related hazards and risks associated with the construction, manufacture, ...
  • Prevention through Design (PtD) for Hazards in Construction 

    Popov, Georgi, PhD, QEP (2016-04-19)
    • As indicated in the Prevention through Design Hierarchy of Controls model, the most effective means of preventing and controlling occupational injuries, illnesses, and fatalities in construction is to avoid, eliminate ...
  • Prevention through Design (PtD) for Hazards in Construction 

    Popov, Georgi, PhD, QEP (2015-09-03)
    With the results of a risk assessment in hand, the optimal move is Prevention through Design (PtD). In this session, you will learn how to affect that link and use PtD methodology for hazards specific to the construction ...
  • Prevention through Design (PtD) Standard Integration 

    Brown, Rayna; Popov, Georgi, PhD, QEP (2014-03-03)
  • PtD BCC MV 

    Biddle, Elyce (2014-01-16)
    The proposed Business Case Calculator for Road Safety Strategies (BCC) will provide safety and health professionals with the ability to demonstrate the business value of preventative interventions that improve the safety ...
  • Using Modified Risk Assessment Methods to Communicate Risk 

    Popov, Georgi, PhD, QEP; Lyon, Bruce, CSP, PE, ARM, CHMM (2016-05-16)
    A conventional Bow Tie Analysis is a combination of a fault tree and event tree analysis used to provide a clear illustration of the risk pathways and control measures in place for situations that do not require a full ...